JL9B-63S Miniature Circuit Breaker (AC MCB)

JL9B-63S Miniature Circuit Breaker (AC MCB)

The JL9B-63S miniature circuit breaker is designed for overcurrent protection in lighting and power distribution systems.

  • Suitable for AC 50/60Hz circuits, up to 415V and 63A.
  • Provides isolation, overload, and short-circuit protection, and can be used for infrequent line switching under normal conditions.
  • Ideal for industrial, commercial, high-rise, and residential applications.
  • Complies with IEC/EN 60847-2 standards for safe and reliable operation.

Reliable protection for every electrical circuit.

Product Description
 ModelRated current (In) (A)Frame currentNumber of polesRated breaking capacityTripping Characteristics
  

JL9B-63S

1

2

4

6

10

16

20

25

32

40

50

63

 

 

 

 

 

 

63

 

 

 

 

1P

2P

3P

4P

 

 

 

 

 

 

4KA

 

 

 

 

 

B

C

D

 

Technical Data
TypeStandard IEC/EN 60847-2
Electrical featuresFunction Overload, Short circuit, Isolation
Number of polesp1P2P3P4P
Rated current (In) (A)A6A, 10A, 16A, 20A, 25A, 32A, 40A, 50A, 63A
Rated voltage UeV400/415V
Frame levelA63A
Insulation voltage UiV500
Rated frequencyHz50/60
Rated breaking capacityA4500
Rated impulse withstand voltage (1.2/50) UimpV6000
Dielectric test voltage at ind. Freq. for 1minkV2
Pollution degree 2
Trip type Thermal magnetic release
Thermal magnetic tripping characteristics B, C, D
Accessories  
Mechanical

features

Mechanical lifeT10000
Electrical lifeT20000
Protection degree IP40
Reference temperature for setting of thermal elements℃30
Ambient temperature (with daily average≤35℃)℃-5~+40
Storage temperature℃-25~+70
Terminal connection type Cable/Pin-type busbar
Installation 

Terminal size top/bottom for cable

mm²35
AWG18/2
 

Terminal size top/bottom for busbar

mm²35
AWG18/2
 

Tightening torque

N*m2
In-lbs18
Mounting On DIN rail EN 60715(35mm) by means of fast clip device
Connection From top and bottom
Curve

JL9B-63S Curve